How long does the PE water pipe need to be replaced?
As a water pipe, the most used pipe fittings is PE water pipe, which is a kind of energy-saving and durable cold water drainage pipe. Environmental sanitation self-cleaning has certain antibacterial and self-cleaning effects, and the drinking water moves freely in the pipeline, which is not easy to scale, and avoids secondary environmental pollution of drinking water. However, the vast majority of customers may not know how long the PE water pipe is required to be upgraded. What are the conditions that require the replacement of the PE water pipe? The PE water pipe manufacturer has the following conditions. If there is, it is required to replace the PE water pipe;
1. Surface cracks of PE water pipes
PE water pipes are exposed to the sun for a long time, exposed to wind and sun, hot and cold. For PE water pipes without sunscreen isolation effect maintenance, all aspects of the performance show a sharp decline, and the service life is shortened. The embrittlement is manifested in the appearance of tiny cracks, unevenness on the surface, the texture of diaphragm vacuum pump, and the loss of smoothness of color tone. This kind of PE water pipe (PE water pipe) is reused, which may cause water seepage and should be replaced immediately.
2. Desoldering of PE pipe weld
The welding seam of the PE water pipe is de-soldered and there is water seepage, which means that the quality of the PE pipe is not good, and the electric welding is not strong, or the welding method may be checked. If the PE water pipe often leaks in multiple sections and repairs it several times a year, this is mostly a product quality problem. If you encounter such a situation, it means that you should replace the new PE water pipe.
3. There is trauma
The PE water pipe has trauma, which is manifested as flood disaster or human error, construction, construction, foundation pit excavation and damage to the PE water pipe, resulting in obvious gaps in the pipe body. Replace some PE water pipe sections as much as possible, or replace all of them. For the new PE water pipe, and do a good job in the security system.
4. There are scratches on the surface of the PE water pipe
If the PE water pipe has very worrying scratches on the surface, for example, the length of the scratch is more than 5 cm and the depth is more than 3 mm. At this time, this kind of PE water pipe is easy to crack and should be replaced immediately to avoid water seepage and increase the harm.
Factors causing damage to PE water pipes
The first category is the problem of the pipe itself. The PE pipe market is rather confusing now. The quality of PE water pipes produced by various manufacturers varies. If the water pipes and fittings used in the project are not from the same manufacturer, or the PE pipes are stored in the open air, the quality of the pipes will be degraded. , affecting the overall quality of the project.
The second element is the construction quality problem. The specific performance is the cracking and leakage of the welding joint. The key is that the PE water pipe and the welding position of the pipe fittings were not cleaned immediately at the construction site, resulting in the contact between water, dust and fools, which caused hot melt adhesion. The connection is not firm, or the main parameters such as hot-melt time and butt pressure are immature.
The third category is human error. If sharp stones are buried during construction, heavy trucks will come in, which will cause water seepage; drilling holes in pipes to steal water; excavators digging leaking pipelines at construction sites; bulldozers bulldozing and other damage It will cause water seepage and damage to the PE water pipe.
Safety Guarantee of PE water pipe Installation
1. In the case of installing PE water pipes, it is necessary to accurately measure the working voltage after the installation of the equipment; at the same time, grounding the shell of the equipment to ensure life safety.
2. After accurately measuring the working voltage of the equipment, it is also necessary to accurately measure the working voltage of the power grid and generator to ensure that the working voltage is continuously maintained at 220V, in order to better avoid damage to the equipment.
3. Because the heating process is used when connecting the PE water pipe, the temperature display light of the heating plate must be on to ensure the welding temperature.
4. Any items that are used to touch the inner hole of the welding must be in condition to prevent the existence of impurities from affecting the final welding quality.
5. In the case of pipe milling, try to lock the milling cutter safely to prevent the milling cutter from flying out and hurting people.
6. If the tube is used, pay attention to leave sufficient spacing to ensure the effective contact of the welding inner hole.
7. When removing the milling cutter and hot plate, the inner hole should not be damaged to prevent unevenness and scratches on the reverse side.
Test after completion of PE water pipe construction
After the construction of the PE water pipe is carried out in the pipeline application, the acceptance of the project must be carried out before it can be announced for use, otherwise there may be problems in the whole process of application.
In the pressure test, be sure to use a pressure gauge with a measurement accuracy of 0.1 Pa, and try to install the pressure gauge at the lowest value of the entire piping system. After the pipeline is filled with water, remove the air in the pipeline, and then turn off the main gate of the water meter. At this time, the experiment can start. The test pressure is 1.5 times the maximum possible working pressure. Usually, the PE water pipe pressure measurement and pressure holding time is three times. In ten minutes, if the entire system is in the condition of no water seepage in the plug, the pressure pointer is reduced to 0.5 kg, which belongs to the normal range.
If there is water seepage, it may be caused by the expansion of the pipeline under internal pressure. For better installation considerations, the entire pipeline system must be inspected once.