Novel uses for Metal Reinforced PE Spiral Corrugated Pipe:
1. PE pipes with smaller diameters can be supplied in the form of long coils, which are very convenient for transportation, laying, and installation; flexible PE pipes with larger diameters can generally be connected on the ground and then laid in the pipe trench, which is very convenient for construction;
2. In some occasions, it is not necessary to dig a pipe trench but use the pipe jacking technology to lay the steel belt reinforced polyethylene spiral corrugated pipe;
3. The long-pipe submersion method can be used to lay PE pipes on the bottom of rivers, lakes, rivers, and seas, or PE water pipes can be laid in deserts without digging trenches:
4. The old drainage pipe can be repaired by using PE plastic pipe as the inner repair pipe.
Advantages of Metal Reinforced PE Spiral Corrugated Pipe
the embedding and installation of PE large-diameter pipe steel strip reinforced polyethylene spiral corrugated pipe The screening and embedding of the pipeline is the main body of the construction of the water supply and drainage system, and it is also the focus of the municipal water supply and drainage engineering construction.
The screening and inspection of construction materials and the negligence of loading and unloading will have an impact on the quality of pipes. The process of pipe screening, it is mainly aimed at the demand for the number of pipes in the construction section, the strict requirements for pipe specifications, and whether the pipes have the above-mentioned appearances. It is an important part of the normal operation of the construction personnel to do a comprehensive inspection.
Different PE pipes have different uses:
the characteristics of gas pipes are mainly that the connection is relatively reliable, the connection is made by electrothermal fusion, and the strength of the joint is higher than that of the pipe itself; it has an impact resistance at low temperatures.
PE large-diameter pipe, steel strip reinforced polyethylene spiral corrugated pipe is more convenient to handle, much lighter than steel pipe, galvanized pipe, and concrete pipe, it is easier to install and handle, and it will not use more manpower and equipment, reducing the installation cost of the project.
Bore Size Metal Reinforced PE Spiral Corrugated Pipe Selection and Construction Connections
Metal Reinforced PE Spiral Corrugated Pipe chooses the diameter of HDPE pipe, which depends on the water consumption of the overall water pipe network, but the actual situation is also different. For example, the water supply system in Tianjin was much smaller than it is now when it was laid in the early New Year because the water consumption in Tianjin was much smaller than it is now.
At present, in the laying of Metal Reinforced PE Spiral Corrugated Pipe, there will be some errors in the preliminary planning and later construction, because it is necessary to take into account issues such as urban greening, seasonal changes, and soil moisture, and also consider the water loss of HDPE water pipes. . Therefore, when choosing the diameter of the HDPE water pipe, the value of the water pipe network should be selected and the allowance should be reserved. The connection method of the PE water pipe construction adopts the hot-melt connection method, and the straight-line laying is relatively simple. It is only necessary to directly connect two pipes. In the case of turning, if the straight pipe is used for direct connection, the flow will be blocked due to the bending, which will cause the curved part to bear more pressure and reduce the service life of the pipe.
Metal Reinforced PE Spiral Corrugated Pipe is equipped with different connecting pipe fittings according to the design of different laying routes. At the same time, to be suitable for different construction sites, we can customize the production of different types of PE water pipes and pipe fittings, which are customized according to customer needs. And ensure that the heating wire is placed on the jacket, overlaps the hot-melt sleeve, and places a pressure plate at the large longitudinal seam of the hot melt to ensure that the interface overlaps are in close contact. Tighten, the on-site environmental conditions, the hot-melt sleeve interface needs 20-30 minutes to cool naturally, and then remove the packing tape and pressure plate.